
BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Model demos and project explainers.
Step-by-step model and project walkthroughs.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreHow We Work
Trust
Careers
Structured, COBie-compliant handover data that your facilities team can open and use on day one, instead of a model that gets archived the week the building closes out.
Most BIM models are built to get a project through construction, not to survive it. The geometry is there, but the asset data, equipment tags, warranty dates, and maintenance schedules either never made it into the model or are buried in a format the FM team's CMMS can't read. Excelize builds Asset Information Modelling into the project from the start, so what gets handed over at closeout is data your building operations team can actually load and use.
Asset Information Modelling is the discipline of capturing structured, non-geometric asset data, equipment types, model numbers, warranty periods, maintenance intervals, inside a BIM model as it's built, so it can be extracted at handover into a format facilities teams can use. COBie (Construction Operations Building Information Exchange) is the specific data schema most U.S. public and institutional owners require for that extraction: a structured spreadsheet format that maps directly into CMMS and CAFM platforms. AIM is the practice; COBie is one common deliverable format it produces. Not every project needs COBie specifically, but most owner-operated buildings need the underlying discipline regardless of which schema the contract calls for.
A door in the model shows its shape and location; it rarely carries the hardware set, fire rating, or warranty expiration that an operations team needs six months in, when something breaks, and nobody remembers which door schedule to check.
Rebuilding asset data after handover, walking the building, tagging equipment by hand, and re-entering everything into a CMMS routinely costs more than capturing it correctly during construction would have.
It usually falls on the owner, well after the project team that could have prevented it has moved on to the next job.
Most models are rich in geometry and thin on the data that an FM team actually needs on the day they take over the building. That gap gets expensive in a specific way, and it's avoidable if the data is captured while the building is still being built.
A defined data drop schedule and responsibility matrix, set at project kickoff, specifies who enters which asset attributes and when, so COBie data doesn't get treated as a closeout scramble.
Structured entry of equipment attributes, manufacturer, model number, install date, warranty term, into the model as it's built, mapped to your owner's specific COBie requirements.
A structured check of populated data against the COBie schema before handover, catching gaps and inconsistencies while they're still cheap to fix.
Structuring the COBie export's field naming and format to align with common CMMS and CAFM import requirements, reducing the manual reformatting an owner's facilities team would otherwise need to do on receipt.
A final pass reconciling the model and its asset data against what was actually installed, since field changes during construction routinely drift from the original model without someone tracking it.
The final COBie deliverable plus a walkthrough of the data structure with your team, so the file's organization is understood at handover, not something your FM team has to reverse-engineer.
We review the owner's project requirements (OPR) or facility data specification and confirm which COBie fields the handover needs to target.
We set the data drop schedule, who enters which fields and when, so asset data population happens progressively through construction, not in a rush at the end.
As the model develops, we populate and validate asset data against the agreed schema, flagging gaps to the project team while there's still time to close them.
A full validation pass against the COBie schema, checking for missing fields, inconsistent naming, and data that won't structure cleanly into the final export.
We deliver the validated COBie file and walk your team through its structure and field naming, so the handover data is understood, not just delivered.
Public agencies and institutional owners often specify COBie explicitly in the contract, sometimes down to which fields are mandatory, so the data plan needs to be locked before modeling starts, not reverse-engineered at closeout. Private commercial owners more often care about whether the data structure is usable in practice than the COBie label itself, which means clean field naming and consistent formatting matter more than schema compliance on paper alone. Design-build teams carry the added complexity of coordinating data entry across multiple subcontractors, each responsible for their own equipment data feeding into one clean file.
The engagement scopes around which of these you're delivering. Consultants work out of New Jersey and California, on U.S. hours, against U.S. facility management standards.
Aligning facility management requirements with the BEP from project inception.
ExploreThe audit: an honest, benchmarked read on where your firm stands today.
ExploreConnecting your BIM, estimation, and procurement systems once adoption sticks.
Explore
Whether it's a formal OPR with COBie fields spelled out or just a general sense of what your facilities team will need, that starting point shapes the scope. Send us where things stand, and a sample comes back in 2 to 3 days.