BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM Consulting
Standards, workflows and ISO 19650 processes that make BIM repeatable across every project your firm takes on.
All services
Staffing & Design Support
Trained modelers and engineers working in your time zone, to your standards — scale up in days, not hiring cycles.
BIM Staffing
Design Support
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Walkthroughs, model demos and project explainers.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreWho We Are
How We Work
Trust
Careers
Scope still evolving, ongoing capacity needed, or one clearly defined deliverable, each gets its own structure, not one contract stretched to fit all three.
The wrong engagement model doesn't just cost more, it creates friction that has nothing to do with the BIM work itself. A fixed-scope contract on a project still moving through design iterations means constant change orders. A dedicated retainer for a single deliverable means paying for capacity that sits idle. Excelize structures around how defined your scope actually is, not a single default contract adjusted after the fact.
For work where scope is still taking shape, phased renovations, projects moving through design iterations, or coordination needs that depend on decisions not yet made.
For firms with ongoing, recurring BIM demand across multiple projects, not a single deliverable.
For a single, clearly scoped deliverable with defined requirements, a fixed cost and timeline agreed before work starts.
The commercial structure changes. The delivery process doesn't.
Drawn from a standing team of Revit modelers, BIM coordinators, MEPF engineers, and QA reviewers, not recruited per project.
Built in before final handover, with senior engineer sign-off on all models, not just a modeler's self-review.
Working inside your existing Autodesk Construction Cloud, BIM 360, or BCF-based coordination environment, so reports import directly into your issue tracking without reformatting.
After final handover, for revision requests and questions that come up once your team is working inside the deliverable.
Not just a file transfer.
Across all projects, tracked as a standing operational benchmark, not a per-engagement estimate.
The same variables drive cost regardless of which model is chosen:
A clearly defined deliverable prices more predictably than a scope still being worked out, which is why scope certainty drives model choice in the first place, not just the price inside it.
Fabrication-ready LOD 400 work carries more coordination depth than an LOD 300 design-development pass. LOD 500, field-verified as-built capture, applies at handover or on Scan to BIM-based existing-conditions work.
A healthcare engagement's clinical planning checkpoint or a multifamily project's template sign-off gate adds rigor a standard federated review doesn't carry.
A one-time deliverable and an ongoing multi-project engagement carry different cost structures by nature, a dedicated studio's fixed monthly cost assumes continuity a single per-project engagement doesn't need.
None of this is negotiated in the abstract. It's scoped specifically for your project during a Discovery Session, before a number gets attached to anything.
Request a sample deliverable package, a real BIM Execution Plan, models, clash reports, and QA documentation from past project work, before deciding which engagement structure fits.
For questions on data handling, ISO 19650 alignment, or getting started with a sample project, see our Industries FAQ →
Still have questions? Book a Discovery Session
Three structures, one delivery standard. Whichever fits your scope, the process behind it doesn't change.