Excelize
Company
Story
Excelize team

Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.

Learn More
Book a Consultation

How Anant Ambani’s Wedding at Jio World Convention Centre Showcased the Modern Indian Architecture.

Pratap Dhopte
Pratap Dhopte •3 min read

After a couple of pre-wedding functions held in different locations, the most awaited Anant Ambani and Radhika Merchant’s wedding finally took place on July 12, 2024. The grand wedding ceremony was held at Jio World Convention Centre, Bandra Kurla Complex, Mumbai.

The wedding lasted for three days, the main ceremony was held on 12th July followed by Shubh Ashirwad on 13th July, and the Mangal Utsav or reception on 14th July. Both Shubh Ashirwad and Mangal Utsav took place in Ambani house Antilia.

The total cost of Anant Ambani’s wedding is estimated at 5000 crores including Nita Ambani’s necklaces worth 500 Crore and Anant Ambani’s watch worth 67.5 crore.

To attend the lavish wedding of Asia’s richest man Mukesh Ambani’s youngest son Anant Ambani Bollywood stars including Amitabh Bachchan, Shah Rukh Khan, Salman Khan, T20 World Cup 2024 winning team players Rohit Sharma, Hardik Pandya, and even politicians showed a presence at The Jio World Centre (BKC).

WWE superstar John Cena was also invited to Anant Ambani’s wedding ceremony. American media personality Kim Kardashian and Khloe Kardashian, two former British Prime Ministers Tony Blair and Boris Johnson some prominent people from outside India were invited to Ambani’s wedding Priyanka Chopra with her husband Nick Jonas also seen enjoying the dance.

Ambani’s completely digitized the wedding, they send a Google form to guests via email followed by a QR code that have to scanned to get an entry at venue.

Jio World Convention Centre was inaugurated in March 2022 by Mukesh and Nita Ambani. This will be the ideal venue to host high-profile weddings, corporate events, exhibitions, conventions, international gatherings, and many other occasions.

Nita Ambani’s vision behind this convention center is to offer the best physical and digital infrastructure along with top-class Indian hospitality, a world-class kitchen that can serve over 18000 meals in a day and the list goes on.

Inside the Jio World Convention Centre

Jio World Centre is spread over an area of 103012 sq. m. It features 5 modular halls with a combined area of 25000 Sq. m., 25 meeting rooms covering 2700 Sq. m, and one ballroom of 3000 Sq. m.

Dhirubhai Ambani Square

This is also called Fountain of Joy. The water jets can reach heights up to 45 feet, with the combination of water, light and music it delivers a mesmerizing experience to the viewers.

Jio World Garden

It is a totally open-air turfed venue, with a grass surface area of 13105 sq. m. Jio World Garden can host 9000 guests at a time. The lush green environment, serene water lakes, and exquisite landscape attract the people towards it.

Nita Mukesh Ambani Cultural Centre (NMACC)

NMACC is a grand theatre with a capacity of 2000 people. It claims that NMACC is Technologically most advanced theatre of India. The intention behind the Nita Mukesh Ambani Cultural Centre is to offer a better platform to promote art and culture.

The Jio World Convention Centre is a great example of modern architecture and technology. BIM technology used to build the Jio World Convention Centre. We are very happy to say that Excelize also part of this huge Indian structure as a BIM Consultant. Excelize as a BIM Consultant worked on this project for 6 months.

What Excelize did?

Jio word center bim model 1
  • Excelize built the structural and architectural BIM model for all floors and three basement models.
  • The work was performed in three stages Design Stage, Construction Stage and As-built Stage. Design stage and construction stage work was performed by Excelize.
  • The project officially started in 2014, and between 2014 and 2019, Excelize worked on-site to enhance performance.

Anant Ambani and Radhika Merchant’s wedding was not just about countries biggest wedding, but their wedding venue the Jio World Convention Centre also showed one of the best examples of Modern Indian architecture.

The venue demonstrates its status as a prime luxury location to host such kinds of events in the future.

The future of the industry

The latest BIM & AEC insights.