Excelize
Company
Story
Excelize team

Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.

Learn More
Book a Consultation

Excelize at the Smart and Digital Rajasthan Summit & Expo 2018 – excelize

Sonali Dhopte
Sonali Dhopte •2 min read
“The #SmartCity vision envisages a balance of heritage with modernism –  we can be #smart while we keep our heritage protected” – Smt. Vasundhara Raje (Chief Minister of Rajasthan)

Excelize’s director Mrs. Sonali Dhopte was invited as an eminent panelist for the Smart and Digital Rajasthan Summit & Expo 2018 scheduled on March 14th and 15th, 2018 at Jaipur. The event was organized jointly by IACC & The Guild to discuss and address the challenges and opportunities in implementing the blueprint of Rajasthan’s Smart Cities vision.

The key leaders at the summit were Mrs. Vasundhara Raje Scindia (Chief Minister of Rajasthan), Shri. Venkaiah Naidu (Vice-President of India), Kenneth Juster (United States Ambassador to India) and Shrichand Kriplani (Hon’ble Minister, UDH & LSG and Chairman, RUDSICO).

This 2-day summit had 50 speakers & over 500 delegates participated in the event. The presentations and the panel discussions were highly inspiring and had a great emphasis on the global perspectives on how to create smart & sustainable cities and showcase best practices & technologies that can help Indian cities and other urban areas become efficient, sustainable and smart by developing more interconnected infrastructure, communications and data systems.

Excelize is honored to have participated in the Summit and embellish the opportunity to share technical knowledge, discuss the challenges and understand the cross-industry opportunities.

Check out the event details: https://www.smartrajasthanexpo.com/

About Excelize:  Excelize is an engineering services firm providing Building Information Modeling (BIM) & CAD solutions to clients in India, Mid-East, UK, Europe, Australia, and the US. These clients include Architects, Engineers, Design-build contractors, General Contractors, Real-Estate developers, building owners and consultants.

About Sonali Dhopte: Architect and Interior Designer since 1993, Sonali has worked with the top architectural firms in the US and India. As Technical Director at Excelize (www.excelize.com), she oversees and guides the BIM team and manages project deliveries as per client requirements. As a leading woman Architect, Sonali is a nationally recognized BIM Expert and has presented and participated in various panel discussions in prestigious conferences and has published various articles on BIM in prestigious journals.

The future of the industry

The latest BIM & AEC insights.