
BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Model demos and project explainers.
Step-by-step model and project walkthroughs.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreHow We Work
Trust
Careers
One fully coordinated unit template, resolved once and propagated across every matching unit type, so an error doesn't get fixed 200 times.
A single-family renovation and a 220-unit apartment building are not the same coordination problem, even though both fall under "residential." Scale changes what breaks. Excelize's multifamily BIM services are scoped to large-scale, repeatable-unit residential construction, not general home design.
A single-family renovation has one shot at getting a detail right. A 220-unit apartment building has the same shot, replicated 220 times over, which means the workflow that works fine on a custom home doesn't scale to a repeating floor plan. A generic BIM process treats every unit as its own coordination event. Nothing carries forward, nothing gets caught once and trusted everywhere.
A developer's proforma assumes a per-unit coordination cost that only holds if the process actually scales. A firm without a repeatable-unit workflow can't deliver that, the cost per unit creeps as issues get caught late and resolved individually, one at a time, instead of once at the template.
Excelize scopes multifamily engagements around the unit template as the central deliverable, not an afterthought inside a broader residential process.
On a repeating floor plan, an error caught once at the template is one fix. The same error caught unit by unit is the same fix, replicated, which is exactly the cost a repeatable-unit workflow exists to prevent.
Structural framing, MEPF risers and branch runs, and finishes resolved together in one model, at LOD 300.
Confirming MEPF vertical runs align across every floor the template repeats on, not just within a single unit.
Since not every unit in a building is identical, corner units, ADA units, and mirrored layouts get coordinated as their own reviewed variants against the base template, not assumed to match it automatically.
Generated per unit type rather than redrawn floor by floor.
Holds the base unit template for review before it's approved to propagate across matching units. Nothing repeats until the template clears this checkpoint.
Runs as a separate pass for any unit that deviates from the base template, corner conditions, ADA units, or mechanical rooms, so a variant doesn't inherit an assumption that only holds for the standard unit.
Confirm MEPF vertical runs stay coordinated floor to floor as the template repeats, catching a stacking conflict before it shows up on multiple levels at once.
The entire risk profile of a multifamily project depends on catching a template error before it propagates, so that's where the process puts its weight.

A template error caught before propagation is a single correction. The same error caught after CD issuance, once it's already been drawn into every matching unit, means re-drawing every one of those units individually, not revising one drawing. On a 200-unit building, that's the difference between one fix and two hundred, and the later it's caught, the more of those units are already under construction when the correction has to happen.
BIM and coordination workflows aligned with ISO 19650 information management principles, a working methodology, not a certification.
Large-scale developments from 50 to 220+ units, mixed-use residential-over-commercial projects, ADA and corner-unit variant coordination.
2,500+ BIM projects delivered since 2004.
U.S. presence: offices in New Jersey and California, project experience concentrated in TX, FL, NY, NJ, CA, PA. Documentation: insurance certificates, MSA terms, and process references available as part of your qualification process.
For questions on data handling, ISO 19650 alignment, or getting started with a sample project, see our Industries FAQ

A clash found on site doesn't just cost a change order. It costs the schedule buffer a commercial project doesn't have. Protect the margin before the bid closes.