Excelize
Company
Story
Excelize team

Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.

Learn More
Book a Consultation

How BIM Is Powering Smart City Development in India

How BIM Is Powering Smart City Development in India

Introduction Smart and sustainable planning is a need of rapidly growing urbanization and population. The conventional construction processes and planning, which rely on 2D drawings, fragmented data, and human coordination, do not satisfy the needs of modern complex projects. Growing population, urbanization To solve this problem, BIM comes in. BIM creates a 3D model of […]

What is Foundation Plan? Everything to Know About Foundation Plans

What is Foundation Plan? Everything to Know About Foundation Plans Foundation Plan Drawings are the most important part of any construction project, as they bear the entire load of the house and transfer it to the underlying soil. Proper foundation plans reduce the risk of mistakes made by the construction team and comply with standard building codes.

Foundation Plan Drawings are the most important part of any construction project, as they bear the entire load of the house and transfer it to the underlying soil. Proper foundation plans reduce the risk of mistakes made by the construction team and comply with standard building codes. These plans provide important information, including load-bearing specifications, […]

Why Aurangabad is the Ideal Location to Live, Work, and Explore

Why-Aurangabad-is-the-Ideal-Location-for-Live-Work-and-Explore

Imagine a city where ancient history meets modern innovation, rich cultural heritage thrives, and abundant career opportunities await. Make it the perfect place to live a happy life. Welcome to Aurangabad, a city where you can fulfill all your needs. Read on to discover why it is the ideal place to live, work, and explore.  […]

42 Important Building Drawings Used in Construction

Building Drawings

These drawings are typically produced using computer-aided design (CAD) software, allowing for precise detailing, revision control, and integration with other disciplines’ drawings. Different types of drawings are needed for building construction. In this article, we have explained 42 types of drawings in detail. Each type serves a specific purpose in conveying critical information to various […]

Ace BIM experts will demonstrate these capabilities

Ace BIM experts will demonstrate these capabilities

BIM is much more than an exceptional 3D model-based software. It is a smart solution that provides builders, architects, and construction professionals the insight and knowledge to plan, structure, develop and manage their building projects better. BIM does this though a better visual analysis of the structure that facilitates effective decision making with BIM. BIM demands an […]

Revolutionizing Construction: Exploring the Latest Trends in Construction Technology

Benefits of BIM: Empowering Sustainability in the AEC Industry

In modern construction, sustainable building practices have emerged as a paramount concern. As the construction industry grapples with the pressing need to reduce waste, conserve resources, and mitigate environmental impacts, two groundbreaking technologies—Building Information Modeling (BIM) and modular construction—are spearheading a profound transformation. This blog post explores the capabilities of BIM and modular construction, unveiling […]

Benefits of BIM: Empowering Sustainability in the AEC Industry

Benefits of BIM: Empowering Sustainability in the AEC Industry

In an era marked by growing environmental concerns and a pressing need for sustainable development, the Architecture, Engineering, and Construction industry (AEC) has found a transformative ally in Building Information Modeling (BIM). BIM has revolutionized how we design, construct, and manage buildings, offering a digital framework that fosters collaboration, communication, and efficiency. As sustainability takes […]

Five Things About BIM You Must Know!

Five Things About BIM You Must Know

A large number of players from the Architecture, Engineering, Construction, and Operation (AECO) industry have been venturing into BIM Adoption in the last few years. Some are at the primary stage, trying to draw the business strategies around BIM, some have implemented BIM for several projects, and others are proud enthusiasts of BIM looking for opportunities […]

5 Reasons Why Digitalization is Thriving in the AECO industry

5 Reasons Why Digitalization is Thriving in the AECO industry

Were the last two years the years of disruption or transformation? While almost every industry faced a slump, it forced companies to adopt long-due digitalization and acquainted many with the concept. We can say the same for the AECO industry (architecture, engineering, construction, and operations) – which is still largely personnel dependent, fragmented and new […]

Technology Trends that will Disrupt the Future of Construction Industry

Technology Trends that will Disrupt the Future of Construction Industry

The AEC industry has been known to be a slow adopter of technology over the past decade. COVID-19 pandemic accelerated adoption across the value chain. Contractors, architects, project co-ordinators and other onsite professionals are now looking at ways to improve efficiencies, optimize costs, reduce time to build, enhance safety standards and improve sustainability metrics. Technology […]