
BIM Services
Concept to fabrication — coordinated Revit models, clash-free federated files and drawing sets your field crews can build from.
All services
BIM insights, how-tos and industry deep dives for AEC teams.
Free downloadable guides for precon, VDC and BIM leaders.
Monthly BIM insights and project lessons in your inbox.
ROI Calculator and ISO 19650 readiness checklist.
Real projects with results in numbers, across five verticals.
Model demos and project explainers.
Step-by-step model and project walkthroughs.
What Is BIM Coordination? Clash Detection, LOD, and the Federated Model Explained
In-House BIM Team vs Outsourcing: What It Actually Costs a U.S. Firm
ISO 19650 Explained: What U.S. AEC Firms Need to Know Before Their Next Bid
Read more40-Story Office Tower, Dallas — 12 Trades Coordinated Clash-Free
420,000 sq ft of Class A commercial delivered at LOD 350 — full coordination, clash resolution and model-linked quantity takeoffs across every discipline.
Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.
Learn MoreHow We Work
Trust
Careers
Design development and coordination capacity that carries your MEP work from 0% DD through plan-check, built inside your firm’s own review process, not around it.
Most design capacity problems aren’t a skills gap. There’s a bandwidth gap. Excelize’s engineers and modelers take ownership of the MEP design process from initial design development through plan-check execution. They coordinate mechanical, electrical, plumbing, and fire protection work against your architectural and structural constraints. Your firm’s own engineers spend their time reviewing and directing. They’re not drafting every sheet by hand.
Engineering Design Support is design development and coordination capacity delivered as an extension of your firm’s own MEP or architectural design process. It covers building services design, model visualization, and constructability analysis, developed against your coordination guidelines and clash-detection rules through the pre-construction phase.
It’s distinct from Design Calculations, which covers the specific code-based numerical work, though the two are frequently scoped together on the same project.
A firm has more active MEP projects than staff hours to move them through plan-check on schedule, and turning work away or missing a submission date are the only two options without added capacity.
Building services coordination gets treated as a late-stage step, brought into the design conversation after architectural and structural decisions are already locked, instead of informing those decisions from 0% DD onward.
A firm hits a busy season and faces the choice between a permanent hire sized for peak workload, which sits underutilized the rest of the year, or letting quality and turnaround slip during the busy months.
Each of these is a bandwidth problem, not a skills problem: added design capacity that plugs into your process lets your own engineers spend their time reviewing and directing, not drafting every sheet.
Ownership of the MEP design process across the project lifecycle, from initial design development through plan-check execution, coordinated against your architectural and structural model.
3D, 4D, and 5D visualization of the Revit architectural and structural model, used to identify clashes, monitor how design changes affect project cost, and reduce waste during construction.
Electrical system design and drafting support, developed alongside mechanical and plumbing scope so all three systems coordinate against one shared model rather than three disconnected ones.
HVAC system design, drafting, and modeling support, built to your firm’s standards and coordinated against structural and architectural constraints from early design development.
Fire protection system design and drafting support, coordinated into the same MEP model as mechanical, electrical, and plumbing scope, rather than handled as a separate, disconnected discipline.
Audits, evaluations, and constructability recommendations aimed at achieving optimal life cycle costing, drawing on experience across infrastructure, retail, commercial, and institutional project types.
HVAC design, energy efficiency, and ventilation standards that govern mechanical system design in the U.S.

Fire protection and life safety system standards, from suppression layout to alarm and egress requirements.

Electrical system design and installation safety, the code basis behind every power and distribution layout.

Ductwork construction and installation standards, from gauge and reinforcement to hanger and seismic requirements.

We confirm which MEP disciplines, project phase, and coordination standards the engagement needs to work against, using your firm's templates and guidelines from the start.
Our team develops the design model and drawings, coordinating mechanical, electrical, plumbing, and fire protection scope against the architectural and structural model as it evolves.
We run coordination and clash detection through the model, flagging conflicts between disciplines early enough in the design process to resolve them before they reach construction.
We review the developing design for constructability, life cycle costing, and safety standards through BIM visual analysis, before it moves toward plan-check.
Design deliverables go to your firm's engineer of record for review, revision, and final sign-off, incorporated back into the model until the design is ready for plan-check submission.
An MEP consulting firm facing a seasonal spike can bring on this capacity for the busy stretch and scale back once the workload normalizes, without carrying a permanent hire through the slower months.
An architecture firm managing multiple building types can get MEP-aware design support early on each one, so building services coordination shapes design decisions instead of reacting to them after the fact.
A Design-Build consultant running several disciplines across concurrent projects can use this specifically where coordination bandwidth, not technical capability, is the actual constraint on how much work the firm can carry.

Onshore support is based in Costa Mesa, California, coordinating directly with your team, while offshore delivery capacity in India extends working hours, allowing design work to progress around the clock rather than only during U.S. business hours.

Whether it’s one system on one project or coordinated MEPF support across several, that scope shapes how quickly we can start. Send us where things stand, and a sample comes back in 2 to 3 days.
Code-based calculations that support your design, reviewed and sealed by your EOR.
ExploreDedicated HVAC modeling and coordination once the load calculations are set.
ExploreFederated multi-trade coordination and clash resolution at the project level.
Explore