Get Your Free BIM Plan in 48 Hours 127 plans delivered this month Book Now →
EXCELIZE

Engineering Design & MEP Coordination Services

0 +

Years of BIM leadership

0 +

Project Completed

0 +

companies prefer Excelize as BIM partner

0 +

global offices and capability centers

MEP services are amongst the most crucial engineering services required by the AEC industry. Keeping this in mind, we at Excelize have developed high-quality capabilities in outsourced MEP design and drafting.

We offer superior quality, cost-effective and time-bound Mechanical, Electrical, and Plumbing (MEP) engineering design & support services for MEP consultants, consulting firms as well as Design-Build consultants.

Our highly skilled modelers, engineers & expert team of coordinators, develop detailed design models, using coordination guidelines, constructability analysis & clash coordination rules during the pre-construction phase, thus focusing on providing valuable information to describe the proposed project.

Our BIM 3D, 4D, and 5D modeling services are critical in visualizing the Revit architectural and structural model, identifying the clashes between various elements, monitoring project costs, and in reducing waste during construction.

Our BIM coordination services allow all the parties involved in the project during its different stages, to collaborate and coordinate with each other, thereby ensuring that the project flows seamlessly.

3D digital twin model of a smart building, showing real-time data on energy usage and temperature.
Structural BIM Modeling Services​ 1 scaled

Our MEPF Service Offerings:

Why choose Excelize

  • We offer superior quality, cost-effective, time-bound MEP engineering design, and support services. Outsourcing CAD services give you the positives of having full-time employees without added expenses.
  • We have a ‘best-in-class team of engineers, estimators, and project managers who deliver flexible and tailored solutions for all requirements, 24 by 7. We understand the requirements and constraints of building services and how they are affected by structural and architectural elements.
  • Our engineers take ownership of the design process throughout the project lifecycle, from the initial design development (0% DD) through plan-check execution.
  • Our comprehensive audits, evaluations, inspections, code calculations, and recommendations are all aimed at achieving optimal life cycle costing.
  • Our exhaustive experience with infrastructure, retail, commercial and institutional projects enable astute constructability analysis and suggestions.
  • The most promising benefit of the constructability analysis is to achieve safety standards in a building through BIM visual analysis.
  • Our quick turnaround time is achieved by the meticulous coordination of many elements of the design. Also, outsourcing leverages the time zone difference to take your projects ahead round-the-clock.
  • We are the chosen project partners for white field developments, new cities, and urban infrastructure developments worldwide.

Get 30% OFF on Your First project

Project Highlights

Strong Domain Expertise

We convert all types of architectural, engineering, and various technical drawings to the format our clients need, within a stipulated time. Our CAD outsourcing services in India combine experience in CAD platforms and design software with strong domain expertise in the construction sector, to create a formidable service offering.

Collaborate with Excelize

On a mission to make AECO community future-ready
and successful with technology

Get a Quote

    (Compatible file types- pdf, dwg of size below 20 MB) For file size greater than 20 MB, use a third party service (Dropbox, Wetransfer or Yousendit) or contact us for FTP.)

    Get a quote