Excelize
Company
Story
Excelize team

Get to know how, since 2004, Excelize grew into the BIM partner U.S. AEC firms trust — 300+ clients served and 2,500+ projects delivered end to end.

Learn More
Book a Consultation

Revit Automation: How AI Is Cutting BIM Modeling Time by 40% in 2026    

AI powered Revit automation showing dual monitor BIM workflow that reduces modeling time by 40 percent in 2026

The Architecture, Engineering, and Construction (AEC) industry is experiencing rapid growth, and Building Information Modeling (BIM) is at the forefront of this transition. The integration of BIM and AI is crucial for all AEC professionals to achieve faster workflows and higher-quality outcomes. In the AEC industry, many processes are repeated often, but AI-driven Revit automation […]

What is Revit? A Complete Guide to BIM Software by Autodesk

What is Revit? A Complete Guide to BIM Software by Autodesk

Revit is a Building Information Modeling software by the renowned software company Autodesk. It has completely transformed the architecture, engineering, and construction (AEC) industry. Revit is a multifunctional software that embeds important project data, such as materials, schedules, costs, and dimensions, directly into the model. Revit allows multiple team members to work on a project […]

How Architects Use BIM for Design: A Complete Process Guide

Curved-facade tower BIM model with three ghosted alternate massing options behind it, showing architectural design iteration

Subhead: The step-by-step process architects actually follow when working in BIM, and what current adoption and ROI data shows about why it’s become standard practice. For US architects, architecture firm principals, and design teams evaluating or refining a BIM workflow. Key Takeaway: BIM is now central enough to US architectural practice that the Bureau of […]

Is BIM More Useful for Design than Construction?

Is BIM More Useful for Design than Construction?

BIM or Building Information Modeling is rapidly becoming the “must-adopt” standard in building and construction projects. BIM, as a practice, spans the management of the physical structure as well as the other useful information of a construction project. The output of the process is what we refer to as BIM models. BIM is far more […]

The BIM modelling complexities and how to manage those

The BIM modelling complexities and how to manage those

Surely everyone here now knows that BIM (Building Information Modelling) is a 3D model-based software that provides architecture, and construction professionals the knowledge and tools to design, construct, and maintain infrastructure more efficiently. It’s probably just as well known that BIM serves as a common knowledge resource for information about a facility forming a reliable […]

BIM for Multifamily Housing: A Complete Guide for US Developers

BIM section view of a five-storey apartment building with one repeated typical unit highlighted across floors

Multifamily housing generates an unusually large volume of fragmented information across many contractors and repeated unit types, and a missing piece of that data can derail a project. BIM addresses this by giving every stakeholder a shared, centralized model instead of disconnected drawings.

Visualization in BIM Modeling leads to reduction in coordination time | Excelize

Visualization in BIM Modeling leads to reduction in coordination time | Excelize

There are many benefits of visualizing an AEC project as if it were constructed. It provides a glimpse into the future to the clients through BIM Modeling services. Visualization helps review the concept and design objectives. It can act as a communication tool for the contractor and the consultant. Visualization is relevant in a project lifecycle, […]

6 Outcomes of BIM Modeling services achieved through changing project design

6 Outcomes of BIM Modeling services achieved through changing project design

Reduction in time brought about by design changes in BIM Modeling services. The major problem faced by the construction industry is the inability to complete the construction projects on time and within the budget. There are several factors in the construction field that lead to time and cost overrun. Poor planning and scheduling, as well […]